13 November 2019

RSS Facebook

Ads

Supplying of Hundreds Acres Of Agricultural land By Repairing a Canal in Kunar

Written by  Manager
Rate this item
(0 votes)

Saturday, October 19, 2019
Kunar (BNA) An irrigation canal after reconstruction was put into utilization in Kunar province.
The canal is 4km long located in Shegal District, it is capable of   irrigation up to 300 acres of farmland.
Ministry of Agriculture Irrigation and Livestock has spent more than 2440,000 Afghanis to repair the canal.
Farmers in Shegal District, Kunar province welcome construction of irrigation canal.
They said so far, there was a lot of water lost in the absence of a canal, and amount of their products was small, but by repairing of this canal, their work will prosper.
T. Yarzada

Leave a comment

Make sure you enter the (*) required information where indicated.
Basic HTML code is allowed.